Introduction

On 1 July 2017, the Building (Earthquake Prone Buildings) Amendment Act 2016 came into force.  It amends the Building Act 2004 to include special provisions for earthquake-prone buildings (mainly in sub-part 6A).  It also replaces the Councils’ individual earthquake prone building policies, which addressed the identification of earthquake prone buildings, and building owners' roles and responsibilities in relation to those buildings and seismic strengthening work. 

Application

Sub part 6A does not apply to residential buildings except for hostels, boarding houses or other specialised accommodation buildings of two or more stories, or buildings containing three or more household units.

Buildings may be classified as priority buildings.  Priority buildings include hospitals, emergency response buildings and educational facilities but also parts of unreinforced masonry buildings which could fall from the building onto a public thoroughfare in an earthquake.

Council responsibilities

The amended Building Act requires territorial authorities (i.e. Councils) to identify potentially earthquake-prone buildings.  For priority buildings in high risk areas, including Canterbury, this must be done within two years and six months of 1 July 2017, or five years from that date for buildings that are not priority buildings.

When the territorial authority identifies a building as potentially earthquake-prone, it must request the owner provide an engineering assessment within 12 months.  The owner can apply for a further 12-month extension, but no later than two months before the engineering report's original due date.  If the owner does not provide an engineering assessment within the required time, the building is deemed to be earthquake-prone and the territorial authority must proceed as if it has assessed it as such. 

On receiving the engineer's assessment, the territorial authority must determine whether a building is earthquake-prone.  A building is earthquake-prone if it has less than 34% of the required seismic strength of a new building, and if it were to collapse, it would likely cause injury or death to people in or near the building, or damage to property.

On identifying an earthquake-prone building, the territorial authority must then "promptly" issue an earthquake-prone building notice (EPB Notice).  The EPB Notice is sent to the owner, affixed to the building and sent to the mortgagee, amongst others. 

Earthquake-prone Building Notices

The EPB Notice must identify that part of the building is earthquake-prone.  It should state that the owner is required to carry out seismic work and the deadline for that seismic work.  The deadline for performing seismic work on priority buildings in high risk areas is seven years and six months from the date the first EPB Notice is issued (and 15 years for any other buildings).

The territorial authority can grant exemptions for performing seismic work in some cases.  Owners of heritage buildings may apply to the territorial authority for an extension of up to 10 years to complete the required seismic work.

The territorial authority may assess information regarding earthquake-prone buildings at any time. It must review any engineering assessments provided by an owner and if it determines that the building is earthquake-prone, it must issue an EPB Notice.

Section 133AT replaces section 112 of the Building Act 2004 for earthquake-prone buildings.  It provides that a building consent authority (i.e. a Council) must not grant building consent for a substantial alteration of a building with an EPB Notice unless the alteration includes the necessary seismic work.  A ‘substantial alteration’ is an alteration where the cost of the work requiring building consent (and the cost of building work in any other building consent in the two years prior) is more than 25% of the value of the building based on the last calculated rateable value.

Before the amendments to the Building Act, territorial authorities were able to issue notices under section 124 of the Building Act requiring the owner of an earthquake-prone building to undertake work to remove or reduce the danger.  Section 124 no longer applies to earthquake-prone buildings and interestingly, the safety requirements a territorial authority may now impose for earthquake-prone buildings under section 133AR is limited to erecting hoardings or fences and issuing notices containing warnings, or restricting entry to the building. 

However, non-compliance with an EPB Notice is an offence, carrying a maximum fine of $200,000.  Recently, the District Court fined a Petone building owner $37,500.00 for its ‘egregious’ failure to comply with a section 124 notice requiring seismic strengthening by 2008.

Territorial authorities can apply to the District Court for orders under section 133AS allowing it to carry out seismic work to buildings with EPB Notices where the owner has not carried out seismic work by the date specified in the EPB Notice.  The owner of the building will be liable for the cost of that work. 

In practice, the Christchurch City Council (CCC) at least, is requesting detailed engineering evaluations (DEE) when it receives a building consent application for non-residential buildings.  If the DEE shows the building, or part of it, to be earthquake prone, the CCC will issue an EPB Notice.  If the building consent is for a “substantial alteration” the CCC can require seismic strengthening of all (or part of) the building to 34% NBS as a condition of the building consent application under section 133AT of the Act.

Unreinforced masonry buildings

Before section 124 was amended, the territorial authorities in Wellington, the Hutt Valley, Marlborough and the Hurunui issued section 124 notices to owners of unreinforced masonry (URM) buildings requiring them to secure street facing parapets and facades within 12 months.  A fund has been established to help meet the cost of this work.  The recent prosecution mentioned above arose out of one of these section 124 notices.

Comment

Given the heightened awareness of the dangers of earthquake-prone buildings since the Canterbury and Hurunui/Kaikoura quakes, the amendments to the Building Act do not convey much urgency in addressing earthquake-prone building issues.
Download article in PDF format



Enter security code:
 Security code

Wynn Williams Christchurch
Level 5, Wynn Williams House, 47 Hereford Street, Christchurch 8013, New Zealand.
PO Box 4341, DX WX11179, Christchurch 8140.
+64 3 379 7622
+64 3 379 2467
Wynn Williams Auckland
Level 25, Vero Centre, 48 Shortland Street, Auckland 1010, New Zealand.
PO Box 2401, Shortland Street, Auckland 1140.
+64 9 300 2600
+64 9 300 2609
Top

This page is best viewed in an up-to-date web browser with stylesheets (CSS) enabled. While you will be able to view the content of this page in your current browser, you will not be able to get the full visual experience. Please consider upgrading your browser software or enabling style sheets (CSS) if you are able to do so. The latest version of Firefox, Safari or Google Chrome will work best if you're after a new browser.